05TRACK RECORD

Every project is judged
by what is delivered.

From tender pricing to site assembly, from insulation retrofits to integrated fire protection—we let verified results speak.

Energy-chemical plant 05 / 06
Nine sectors. One delivery standard.
01SECTORS

Project experience
across nine sectors

Mechanical engineering, energy, oil and gas, offshore and marine, wind, pharma, construction, rail and chemicals.

GLOBALLONG-TERM COLLABORATION

Trusted by global energy-chemical owners and EPC leaders

Long-standing relationships with global energy-chemical owners and leading EPC contractors, built on delivery.

TOYOFLUORWORLEYCTCIBASF
Middle East中东

Large energy and petrochemical programmes with stringent international and local requirements.

Southeast Asia东南亚

Fast-growing manufacturing and energy markets where cross-border delivery and cost optimisation meet.

Europe & Americas欧美

Mature, high-standard markets where compliance, auditability and whole-life value come first.

Eurasia欧亚大陆

Engineering nodes between East and West, with complex logistics and multi-standard adaptation.

02CASE STUDIES

Seven cases.
Seven ways to make a solution land.

Each case starts with a real problem and ends with a result that can be checked.

Cold-connection pipe support technical drawing
Cold-formed channel pipe-support schedule from the tender package.
CASE 01 / VERIFIABLE DELIVERY

Foreign-invested EPC: cold-connection pipe support tender

A time-critical international EPC tender with unclear site conditions. We were asked to price a cold-connection modular pipe-support system, proposed an optimised solution and delivered both design and price.

Context
International foreign-invested EPC tender, tight deadline, site conditions not fully defined.
Our role
Proposed a cold-connection modular support solution and optimised the selection and price to project conditions.
Deliverable
Cold-connection pipe-support solution plus a competitive tender price.
ControlledBudget, quality and execution
1integrated system
0site welding
Steam-line insulation build-up technical section
Aerogel and foam-glass build-up.
CASE 02 / VERIFIABLE DELIVERY

Steam-line insulation upgrade: lower heat loss

Ageing insulation on an existing steam line was losing too much heat. The brief: upgrade the insulation on the existing pipe, without replacing the pipe itself.

Context
Ageing insulation and excessive heat loss; upgrade on the existing line.
Design
Measured the existing thermal performance, compared high-performance alternatives, back-calculated thickness for equal heat loss, specified layered installation and sealed joints, and staggered the transition to remove thermal bridges.
Verification
Post-upgrade heat loss can be measured and verified.
No replacementexisting pipe left in place
Verifiableheat-loss performance
0local thermal bridges
Integrated AES fire blanket and insulation section
One build-up for fire and thermal duty.
CASE 03 / VERIFIABLE DELIVERY

Ethylene piping in confined space: integrated AES fire protection and insulation

Ethylene piping routed through a confined space required an AES fire blanket, while the line still had to meet process insulation requirements.

Context
Confined-space ethylene piping needed an AES fire blanket plus process insulation—two systems that could stack up and consume maintenance space.
Design
Integrated fire and thermal selection; layered build-up sized for the confined space and maintenance access; fixing and cladding design; thermal performance balanced with AES fire duration.
Value
One system for insulation and AES fire protection; buildable and maintainable in the confined space; compliant with AES and owner acceptance.
1system, two duties
AEScode requirement
Accessibleconfined-space build-up
Large petrochemical tank farm, as installed
30 mm aerogel replaces 100 mm foam glass.
CASE 04 / VERIFIABLE DELIVERY

Large petrochemical tank: 30 mm aerogel replaces 100 mm foam glass

A large petrochemical ring-wall tank was specified with 100 mm foam glass—complex, difficult and costly. We combined radiative and conductive heat-transfer analysis, fire temperature simulation and cost-performance comparison into a complete design and execution path.

Original
100 mm foam glass: complex, difficult and expensive.
Analysis
Radiative and conductive analysis, fire temperature simulation and cost-performance comparison.
Outcome
Product temperature stayed within the 100 °C design value; external shell temperature was 54.5 °C at 26 °C ambient and 9 m/s wind; the aerogel layer also served as the fire barrier, verified for a 2-hour hydrocarbon fire.
Economics
Material and installation cost was RMB 350,500 versus RMB 639,900 for foam glass—RMB 289,400 (about 45%) lower; insulation volume down 70% and support steel down 77%.
45%lower total investment
54.5°Cexternal shell temperature
2 hhydrocarbon fire
-77%support steel
Worker installing grating clamps with a power tool
Cold-connection installation on site, no hot work
CASE 05 / VERIFIABLE DELIVERY

Galvanised steel structure: system-wide cold-connection M&E installation

The project used galvanised steel, so no pipe support could be site-welded without damaging the coating. We delivered a system-wide cold-connection solution across civil, E&I and piping—no welding, no re-coating.

Context
Galvanised steel structure; no site welding on pipe supports to protect the coating.
Design
A complete cold-connection system; no site welding or re-coating; the original corrosion protection of structure and equipment remains intact.
Value
Protects the coating and cuts hot work; modular assembly is faster and easier to maintain; installed cost is significantly lower.
0site welds
0re-coating
Modularfast, maintainable
Coating thickness gauge checking galvanised components
Coating process validation with traceable thickness checks
CASE 06 / VERIFIABLE DELIVERY

CX conditions: innovative cold connection and heavy-duty supports

A high-standard integrated project required cold-connection M&E systems with CX corrosion resistance. We worked with the client on coating solutions for confined-space components and completed structural checks for long-span, vertical heavy-duty supports.

Context
Cold-connection M&E systems with CX corrosion resistance; coating confined-space components was difficult.
Design
Joint development of a coating process for confined-space components; structural checks for bending, shear, normal and shear stress on long-span vertical supports; load calculations and support drawings issued.
Value
A tested, innovative coating process and execution plan; a reliable cold connection matched to the tower structure; local equipment coating protected; withstood a Category 12 typhoon.
Cat. 12typhoon verified
4 checksstructural checks
Testedcoating validation
EN 14399 beam clamps and pipe supports on site
EN 14399 beam clamps and pipe supports, as installed.
CASE 07 / VERIFIABLE DELIVERY

EN 14399 beam clamps: AVL sourcing alternative

A UK-standard green-energy project used cold-connection beam clamps under EN 14399. The owner’s AVL named only one German supplier, with a long lead time and a high price. We defined the specification, load-tested potential suppliers and created a competitive tender strategy.

Context
Only one German supplier on the owner AVL, with long lead time and high price.
Design
Defined the underlying requirement and technical specification; load-tested potential AVL suppliers; issued load calculations and support drawings.
Value
Created a competitive tender; pushed the incumbent on price and lead time; saved more than 50% of material cost, with flexible, controllable delivery.
50%+material cost saved
EN 14399standard system
Competitivetender strategy
03FIELD NOTES

The site is the final standard.

Not renders—installation details as they happen: insulation, supports, cold connections and every fixing point.

Insulation being wrapped around a pipe on site

Insulation being wrapped on site, including the pipe joint.

01 / 11
04ENGINEERING CAPABILITY

Engineering capability
across the whole flow

From thermal calculation to site assembly, we provide verifiable system solutions for energy-chemical facilities.

01 / CAPABILITY

Cold-connection structural design

Concept selection and testing, with calculation reports and support drawings.

02 / CAPABILITY

Fireproofing and insulation design

Systematic fire and thermal solutions for tanks, process piping and irregular geometry.

03 / CAPABILITY

Modular installation

Cold-connection assembly without hot work protects coatings and shortens the schedule.

“Success belongs to the client—and we aim to deliver a little better than expected.”
— The XCD / RuiZe service philosophy
→NEXT STEP

The next case starts with one diagnostic.

Bring a live project. In one diagnostic we will make the technical, cost and delivery path clear.